27/11/17
Existing Suspended Ceiling has been stripped back and new bulkheads installed.
These bulkheads will form the top of the new glazed office partitions.
Comments:
Get In Touch Today!
Tel. 07791775800
Tel. 07983990920
info@criterion.build